Phase 1 Eco Connector (Fuzhou)

Completion 2015

The first initial stage of the demonstrative walkway system was completed in May 2015. It brings the concept one step closer to reality. Situated at the entrance of a sports facility, the project consists of a spiral ramp structure which forms a landmark and an important entrance to the walkway system. Along this walkway it has rain shelters and staircases that connect to a garden which is filled with local flora and recreational amenities.

nike dunk high black leather chair for sale | NIKE HOMME

Urban Design